Vitreous LabsEnergy transparency

NWJ MET VESANCY II

A battery of 1.24 MW and 2.43 MWh in Vesancy, on Enedis’s distribution grid, in service since 26 March 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
In service26 March 2026
CommuneVesancy, Ain, Auvergne-Rhône-Alpes
NetworkEnedis, HTA
Substation it connects throughGEX
Placed on the mapat the centre of its commune, Vesancy, from geo.api.gouv.fr
EIC code17W000002441437M

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map