NWJ MET VILLENEUVE SUR YONNE

A battery of 1 MW and 2.43 MWh in Villeneuve-sur-Yonne, on Enedis’s distribution grid, in service since 25 August 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1 MW
Energy2.43 MWh
Hours at full power2.4
Charging power1 MW
In service25 August 2026
CommuneVilleneuve-sur-Yonne, Yonne, Bourgogne-Franche-Comté
NetworkEnedis, HTA
Substation it connects throughRousson (ROUSS)
Placed on the mapat the distribution substation it connects through (Rousson), from Caparéseau
EIC code17W000002515141Y

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.