NWJ MET Volvic

A battery of 1.24 MW and 0.9 MWh in Volvic, on Enedis’s distribution grid, in service since 18 March 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy0.9 MWh
Hours at full power0.7
Charging power1.25 MW
In service18 March 2026
CommuneVolvic, Puy-de-Dôme, Auvergne-Rhône-Alpes
NetworkEnedis, HTA
Substation it connects throughCroix-De-Neyrat (C.NEY)
Placed on the mapat the distribution substation it connects through (Croix-De-Neyrat), from Caparéseau
EIC code17W0000024424929

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.