A battery of 1.24 MW and 2.43 MWh in Wittenheim, on Enedis’s distribution grid, in service since 7 April 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power1.24 MW
Energy2.43 MWh
Hours at full power2.0
Charging power1.24 MW
In service7 April 2025
CommuneWittenheim, Haut-Rhin, Grand Est
NetworkEnedis, HTA
Substation it connects throughANNA
Placed on the mapat the centre of its commune, Wittenheim, from geo.api.gouv.fr
EIC code17W0000022479041

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.