A battery of 3 MW and 3 MWh in Plouguin, on Enedis’s distribution grid, in service since 17 February 2023. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power3 MW
Energy3 MWh
Hours at full power1.0
Charging power3 MW
In service17 February 2023
CommunePlouguin, Finistère, Bretagne
NetworkEnedis, HTA
Substation it connects throughLannilis (LANN6)
Placed on the mapat the distribution substation it connects through (Lannilis), from Caparéseau
EIC code17W000001495624I

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map