Saft Bordeaux

A battery of 3.65 MW and 7.7 MWh in Bordeaux, on Enedis’s distribution grid, in service since 24 October 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power3.65 MW
Energy7.7 MWh
Hours at full power2.1
Charging power4.35 MW
In service24 October 2024
CommuneBordeaux, Gironde, Nouvelle-Aquitaine
NetworkEnedis, HTA
Substation it connects throughLUZE
Placed on the mapat the centre of its commune, Bordeaux, from geo.api.gouv.fr
EIC code17W000002125637R

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.