Stockage Vinay

A battery of 3.5 MW and 7.4 MWh in Vinay, on GreenAlp’s distribution grid, in service since 26 June 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power3.5 MW
Energy7.4 MWh
Hours at full power2.1
Charging power3.5 MW
In service26 June 2024
CommuneVinay, Isère, Auvergne-Rhône-Alpes
NetworkGreenAlp, HTA
Substation it connects throughVinay (VINAY)
Placed on the mapat the distribution substation it connects through (Vinay), from Caparéseau
EIC code17W000002101761L

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.