Vitreous LabsEnergy transparency

Storage site 2 at Fortelet

A battery of 25 MW and 40 MWh in Dunkerque, on RTE’s transmission grid, in service since 28 July 2021. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power25 MW
Energy40 MWh
Hours at full power1.6
Charging power25 MW
In service28 July 2021
CommuneDunkerque, Nord, Hauts-de-France
NetworkRTE, 90 kV
Substation it connects throughFORTE
Placed on the mapat the centre of its commune, Dunkerque, from geo.api.gouv.fr
EIC code17W0000013391684
Name as filedFORTES02-STOCKAGE N0 02 DE FORTELET

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map