A battery of 65 MW and 130 MWh in Saint-Avold, on RTE’s transmission grid, in service since 28 April 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power65 MW
Energy130 MWh
Hours at full power2.0
In service28 April 2026
CommuneSaint-Avold, Moselle, Grand Est
NetworkRTE, 63 kV
Substation it connects throughE.HUC
Placed on the mapnear RTE’s ST-Avold, 63 kV substation in Saint-Avold, whose position RTE publishes only approximately
EIC code17W000002455310K
Name as filedE.HUCS04-STOCKAGE N0 04 DE EMILE-HUCHET

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.