A battery of 8 MW and 8.3 MWh in Antugnac, on RTE’s transmission grid, in service since 13 June 2022. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power8 MW
Energy8.3 MWh
Hours at full power1.0
Charging power8 MW
In service13 June 2022
CommuneAntugnac, Aude, Occitanie
NetworkRTE, 63 kV
Substation it connects throughANTUG
Placed on the mapat the centre of its commune, Antugnac, from geo.api.gouv.fr
EIC code17W0000022119173
Name as filedANTUGS01-STOCKAGE N0 01 DE ANTUGNAC

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.