Vitreous LabsEnergy transparency

Storage site at Barban

A battery of 105 MW and 105 MWh in Saucats, on RTE’s transmission grid, in service since 10 April 2023. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power105 MW
Energy105 MWh
Hours at full power1.0
In service10 April 2023
Connected27 June 2023
CommuneSaucats, Gironde, Nouvelle-Aquitaine
NetworkRTE, 225 kV
Substation it connects throughBARBA
Placed on the mapnear RTE’s Saucats, 400 kV substation in Saucats, whose position RTE publishes only approximately
EIC code17W000001637626Q
Name as filedBARBAS01-STOCKAGE N0 01 DE BARBAN

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map