Storage site at Bellac
A battery of 10 MW and 24 MWh in Bellac, on RTE’s transmission grid, in service since 9 June 2023. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 10 MW |
| Energy | 24 MWh |
| Hours at full power | 2.4 |
| In service | 9 June 2023 |
| Connected | 4 January 2022 |
| Commune | Bellac, Haute-Vienne, Nouvelle-Aquitaine |
| Network | RTE, 90 kV |
| Substation it connects through | BEL12 |
| Placed on the map | near RTE’s Bellac, 90 kV substation in Bellac, whose position RTE publishes only approximately |
| EIC code | 17W000002014165N |
| Name as filed | BEL12S01-STOCKAGE N0 01 DE BELLAC (RINGO) |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.