Vitreous LabsEnergy transparency

Storage site at Bellac

A battery of 10 MW and 24 MWh in Bellac, on RTE’s transmission grid, in service since 9 June 2023. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power10 MW
Energy24 MWh
Hours at full power2.4
In service9 June 2023
Connected4 January 2022
CommuneBellac, Haute-Vienne, Nouvelle-Aquitaine
NetworkRTE, 90 kV
Substation it connects throughBEL12
Placed on the mapnear RTE’s Bellac, 90 kV substation in Bellac, whose position RTE publishes only approximately
EIC code17W000002014165N
Name as filedBEL12S01-STOCKAGE N0 01 DE BELLAC (RINGO)

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map