Storage site at Blenod
A battery of 15 MW and 15 MWh in Blénod-lès-Pont-à-Mousson, on RTE’s transmission grid, in service since 1 July 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 15 MW |
| Energy | 15 MWh |
| Hours at full power | 1.0 |
| In service | 1 July 2024 |
| Commune | Blénod-lès-Pont-à-Mousson, Meurthe-et-Moselle, Grand Est |
| Network | RTE, 400 kV |
| Substation it connects through | BLENO |
| Placed on the map | near RTE’s Avrima, 63 kV substation in Blénod-lès-Pont-à-Mousson, whose position RTE publishes only approximately |
| EIC code | 17W0000021448673 |
| Name as filed | BLENOS01-STOCKAGE N0 01 DE BLENOD |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.