Storage site at Blenod

A battery of 15 MW and 15 MWh in Blénod-lès-Pont-à-Mousson, on RTE’s transmission grid, in service since 1 July 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power15 MW
Energy15 MWh
Hours at full power1.0
In service1 July 2024
CommuneBlénod-lès-Pont-à-Mousson, Meurthe-et-Moselle, Grand Est
NetworkRTE, 400 kV
Substation it connects throughBLENO
Placed on the mapnear RTE’s Avrima, 63 kV substation in Blénod-lès-Pont-à-Mousson, whose position RTE publishes only approximately
EIC code17W0000021448673
Name as filedBLENOS01-STOCKAGE N0 01 DE BLENOD

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.