Vitreous LabsEnergy transparency

Storage site at Doppler

A battery of 100 MW and 192 MWh in Nantes, on RTE’s transmission grid, in service since 7 November 2025. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power100 MW
Energy192 MWh
Hours at full power1.9
In service7 November 2025
Connected12 August 2025
CommuneNantes, Loire-Atlantique, Pays de la Loire
NetworkRTE, 63 kV
Substation it connects throughDOPPL
Placed on the mapnear RTE’s Blottereau, 63 kV substation in Nantes, whose position RTE publishes only approximately
EIC code17W000002315528O
Name as filedDOPPLS01-STOCKAGE N0 01 DE DOPPLER

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map