Vitreous LabsEnergy transparency

Storage site at Esquerchin

A battery of 4.88 MW and 4 MWh in Cuincy, on RTE’s transmission grid, in service since 6 July 2020. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power4.88 MW
Energy4 MWh
Hours at full power0.8
Charging power4.76 MW
In service6 July 2020
CommuneCuincy, Nord, Hauts-de-France
NetworkRTE, 90 kV
Substation it connects throughESQUE
Placed on the mapat the centre of its commune, Cuincy, from geo.api.gouv.fr
EIC code17W0000013391676
Name as filedESQUES01-STOCKAGE N0 01 DE ESQUERCHIN

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.