Storage site at Hypercourt
A battery of 7.2 MW and 8.7 MWh in Hypercourt, on RTE’s transmission grid, in service since 1 October 2024. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 7.2 MW |
| Energy | 8.7 MWh |
| Hours at full power | 1.2 |
| In service | 1 October 2024 |
| Commune | Hypercourt, Somme, Hauts-de-France |
| Network | RTE, 63 kV |
| Substation it connects through | HYPER |
| Placed on the map | near RTE’s Pertain, 63 kV substation in Hypercourt, whose position RTE publishes only approximately |
| EIC code | 17W0000021448681 |
| Name as filed | HYPERS01-STOCKAGE N0 01 DE HYPERCOURT |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.