Vitreous LabsEnergy transparency

Storage site at Joux-La-Ville

A battery of 13 MW and 12 MWh in Joux-la-Ville, on RTE’s transmission grid, in service since 18 November 2021. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power13 MW
Energy12 MWh
Hours at full power1.0
Charging power13 MW
In service18 November 2021
CommuneJoux-la-Ville, Yonne, Bourgogne-Franche-Comté
NetworkRTE, 225 kV
Substation it connects throughJoux-La-Ville (J.VIL)
Placed on the mapat the distribution substation it connects through (Joux-La-Ville), from Caparéseau
EIC code17W0000013536488
Name as filedJ.VILS01-STOCKAGE N0 01 DE JOUX-LA-VILLE

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map