A battery of 1.2 MW and 1.2 MWh in Les Mées, on RTE’s transmission grid, in service since 14 December 2022. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 1.2 MW |
| Energy | 1.2 MWh |
| Hours at full power | 1.0 |
| Charging power | 1.2 MW |
| In service | 14 December 2022 |
| Commune | Les Mées, Alpes-de-Haute-Provence, Provence-Alpes-Côte d'Azur |
| Network | RTE, 225 kV |
| Substation it connects through | MEES |
| Placed on the map | at the centre of its commune, Les Mées, from geo.api.gouv.fr |
| EIC code | 17W000001521150I |
| Name as filed | MEES S01-STOCKAGE N0 01 DE MEES (LES) (SOLAIRE 1) |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.