Storage site at Quirin
A battery of 82 MW and 160 MWh in Pleyber-Christ, on RTE’s transmission grid, in service since 27 August 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.
In the national register
| Power | 82 MW |
| Energy | 160 MWh |
| Hours at full power | 1.9 |
| In service | 27 August 2026 |
| Connected | 17 March 2026 |
| Commune | Pleyber-Christ, Finistère, Bretagne |
| Network | RTE, 225 kV |
| Substation it connects through | QUIRI |
| Placed on the map | near RTE’s Pleyber-Christ, 63 kV substation in Pleyber-Christ, whose position RTE publishes only approximately |
| EIC code | 17W0000024408664 |
| Name as filed | QUIRIS01-STOCKAGE N0 01 DE QUIRIN |
What is not published
Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.
Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.