A battery of 240 MW and 480 MWh in Cernay-lès-Reims, on RTE’s transmission grid, in service since 12 January 2026. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power240 MW
Energy480 MWh
Hours at full power2.0
In service12 January 2026
CommuneCernay-lès-Reims, Marne, Grand Est
NetworkRTE, 225 kV
Substation it connects throughSSLAI
Placed on the mapnear RTE’s Cernay, 63 kV substation in Cernay-lès-Reims, whose position RTE publishes only approximately
EIC code17W000002385265P
Name as filedSSLAIS01-STOCKAGE N0 01 DE SAINT-LAID

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.