Vitreous LabsEnergy transparency

Storage site at Synthese

A battery of 25 MW and 25 MWh in Saint-Avold, on RTE’s transmission grid, in service since 11 October 2021. Every fact below is the national register’s own, and a field not shown is one the register leaves blank.

In the national register

Power25 MW
Energy25 MWh
Hours at full power1.0
Charging power25 MW
In service11 October 2021
CommuneSaint-Avold, Moselle, Grand Est
NetworkRTE, 63 kV
Substation it connects throughSYNTH
Placed on the mapnear RTE’s ST-Avold, 63 kV substation in Saint-Avold, whose position RTE publishes only approximately
EIC code17W0000013536496
Name as filedSYNTHS01-STOCKAGE N0 01 DE SYNTHESE

What is not published

Who owns this battery, who trades its power, and what it earns: the register carries none of these, and no French body publishes a battery’s metered output or the instructions RTE gives it.

Source: Registre national des installations de production et de stockage d’électricité, register of 31 August 2026, on ODRÉ, Licence Ouverte 2.0. Substation positions from Caparéseau.

All batteries  ·  On the map