Agersted Energy Park battery

Operating, 10 MW · 40 MWh, in Brønderslev Municipality, owned by European Energy A/S. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power10 MW
Capacity40 MWh
Duration4.0 hours
StatusOperating, as of 14 July 2026
Owner’s dateJuly 2026, actual
Bidding zoneDK1, West Denmark
MunicipalityBrønderslev
Grid connectionBeside the 31 MW Agersted solar park (operating since 2022)
Placed on the mapat Agersted, the place its source names (GeoNames)
Nearest transmission stationDybvad (150 kV), 10 km away: 49 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerEuropean Energy A/S
Ultimate ownerEuropean Energy A/S
DeveloperEuropean Energy A/S
OptimiserDanske Commodities

Not published anywhere we have found: built by.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B003.