Vitreous LabsEnergy transparency

DSV Horsens battery

Being built, 18 MWh, power not stated, in Horsens Municipality, owned by DSV. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Powernot stated by any source
Capacity18 MWh
StatusBeing built, as of 20 April 2026
Bidding zoneDK1, West Denmark
MunicipalityHorsens
Placed on the mapat Horsens, the town its source names (GeoNames)
Nearest transmission stationHatting (150 kV), 6 km away: 16 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerDSV
Built bySoltech Energy Solutions (installation and commissioning); Nordic Smart Grid Solutions (commissioning)

Not published anywhere we have found: ultimate owner, developer, optimiser.

What the sources say

Soltech's release of 20 April 2026: an order to install and commission an 18 MWh battery park for DSV in Horsens, hardware bought separately by DSV. Nordic Smart Grid Solutions describes commissioning an 8 MWh system for DSV in Horsens (undated). Power not stated. Behind DSV's own meter at its Horsens site, as far as the sources say.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B034.

All batteries  ·  On the map