Operating, size not stated by any source, in Kolding Municipality, owned by EWII. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Powernot stated by any source
StatusOperating, as of 13 May 2025
Bidding zoneDK1, West Denmark
MunicipalityKolding
Grid connectionBeside EWII's headquarters in Kolding
Placed on the mapat Kolding, the town its source names (GeoNames)
Nearest transmission stationBramdrup (150 kV), 2 km away: 488 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerEWII

Not published anywhere we have found: ultimate owner, developer, built by, optimiser.

What the sources say

Size never published. EWII's March 2024 programme was 47 MW / 63 MWh across Hasle (30/43), Korsør (3/3.5), Munkebo (8/9.2) and Kolding, which would leave about 6 MW for Kolding; that is arithmetic on EWII's own figures, not a stated size, so the list carries none.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B012.