Fjelstrup battery, Haderslev
Permitted, 44 MW · 125 MWh, in Haderslev Municipality, developed by E&B Renewables ApS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 44 MW |
| Capacity | 125 MWh |
| Duration | 2.8 hours |
| Status | Permitted, as of 19 November 2025 |
| Bidding zone | DK1, West Denmark |
| Municipality | Haderslev |
| Address in the permit | Vestvej 11, Fjelstrup |
| Placed on the map | at the address its permit gives (Vestvej 11, Fjelstrup), found on OpenStreetMap |
| Nearest transmission station | Magstrup (150 kV), 13 km away: 184 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Developer | E&B Renewables ApS |
Not published anywhere we have found: owner, ultimate owner, built by, optimiser.
What the sources say
Rural-zone permit 19 November 2025, up to 44 MW / 125 MWh.
Evidence and sources
- name: backoffice.haderslev.dk/media/bgphybqw/landzonetilladelse-vestvej-11.pd…
- developer: haderslev.dk/media/mpklwmdg/vvm-screeningsafgoerelse-for-en-…
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B042.