Glejbjerg solar park battery
Permitted, 134 MW, in Vejen Municipality, owned by Glejbjerg Solar Park ApS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 134 MW |
| Status | Permitted, as of 27 November 2025 |
| Bidding zone | DK1, West Denmark |
| Municipality | Vejen |
| Placed on the map | at Glejbjerg, the place its source names (GeoNames) |
| Nearest transmission station | Holsted (150 kV), 7 km away: 640 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Owner | Glejbjerg Solar Park ApS |
Not published anywhere we have found: ultimate owner, developer, built by, optimiser.
What the sources say
Vejen Municipality's permit of 27 November 2025: about 134 MW in 120 twenty-foot containers of 1.12 MW each, on about 3 ha.
Evidence and sources
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B044.