Vitreous LabsEnergy transparency

Glejbjerg solar park battery

Permitted, 134 MW, in Vejen Municipality, owned by Glejbjerg Solar Park ApS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power134 MW
StatusPermitted, as of 27 November 2025
Bidding zoneDK1, West Denmark
MunicipalityVejen
Placed on the mapat Glejbjerg, the place its source names (GeoNames)
Nearest transmission stationHolsted (150 kV), 7 km away: 640 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerGlejbjerg Solar Park ApS

Not published anywhere we have found: ultimate owner, developer, built by, optimiser.

What the sources say

Vejen Municipality's permit of 27 November 2025: about 134 MW in 120 twenty-foot containers of 1.12 MW each, on about 3 ha.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B044.

All batteries  ·  On the map