GreenLab Skive battery

Being built, 45 MWh, power not stated, in Skive Municipality, owned by Eurowind Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Powernot stated by any source
Capacity45 MWh
StatusBeing built, as of 11 March 2025
Owner’s dateend 2025, expected
Bidding zoneDK1, West Denmark
MunicipalitySkive
Grid connectionPart of the 84.8 MW GreenLab Skive wind and solar park
Placed on the mapat Skive, the town its source names (GeoNames)
Nearest transmission stationBilstrup (150 kV), 4 km away: 232 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerEurowind Energy
DeveloperEurowind Energy

Not published anywhere we have found: ultimate owner, built by, optimiser.

What the sources say

A 45 MWh two-hour LFP system; power not stated (two hours would mean about 22.5 MW, which is not a published figure). Expected in operation by the end of 2025; no confirmation found.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B024.