Vitreous LabsEnergy transparency

Handest Hede battery

Announced, 35 MW · 140 MWh, in Mariagerfjord Municipality, owned by K/S Handest Hede Sol. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power35 MW
Capacity140 MWh
Duration4.0 hours
StatusAnnounced, as of 24 March 2026
Bidding zoneDK1, West Denmark
MunicipalityMariagerfjord
Placed on the mapat Handest, the place its source names (GeoNames)
Nearest transmission stationHornbæk (150 kV), 15 km away: 128 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerK/S Handest Hede Sol

Not published anywhere we have found: ultimate owner, developer, built by, optimiser.

What the sources say

Screening decision 24 March 2026, inside Energipark Handest Hede (local plan 186/2023).

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B048.