Handest Hede battery
Announced, 35 MW · 140 MWh, in Mariagerfjord Municipality, owned by K/S Handest Hede Sol. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 35 MW |
| Capacity | 140 MWh |
| Duration | 4.0 hours |
| Status | Announced, as of 24 March 2026 |
| Bidding zone | DK1, West Denmark |
| Municipality | Mariagerfjord |
| Placed on the map | at Handest, the place its source names (GeoNames) |
| Nearest transmission station | Hornbæk (150 kV), 15 km away: 128 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Owner | K/S Handest Hede Sol |
Not published anywhere we have found: ultimate owner, developer, built by, optimiser.
What the sources say
Screening decision 24 March 2026, inside Energipark Handest Hede (local plan 186/2023).
Evidence and sources
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B048.