Hasle battery, Bornholm

Operating, 30 MW · 43 MWh, in Bornholm Municipality, owned by EWII. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power30 MW
Capacity43 MWh
Duration1.4 hours
StatusOperating, as of 13 May 2025
Owner’s date13 May 2025, actual
Bidding zoneDK2, East Denmark
MunicipalityBornholm
Grid connectionBeside the high-voltage station at Hasle
Placed on the mapat Hasle, the place its source names (GeoNames)
Nearest transmission stationKastrup (132 kV), 139 km away: 24 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerEWII

Not published anywhere we have found: ultimate owner, developer, built by, optimiser.

What the sources say

116 battery racks, 1,400 m2. EWII says it delivers ancillary services to Energinet and could one day help supply Bornholm if the cable to Sweden fails. Bornholm is in DK2.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B010.