Haslund wind site battery
Announced, 9 MW · 20 MWh, in Randers Municipality. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 9 MW |
| Capacity | 20 MWh |
| Duration | 2.2 hours |
| Status | Announced, as of 19 December 2025 |
| Bidding zone | DK1, West Denmark |
| Municipality | Randers |
| Address in the permit | Haslundkærvej 33C, 8940 Randers SV |
| Placed on the map | at Haslund, the place its source names (GeoNames) |
| Nearest transmission station | Moselund (150 kV), 5 km away: 164 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
No source read names who is behind it.
Not published anywhere we have found: owner, ultimate owner, developer, built by, optimiser.
What the sources say
Screening decision of 19 December 2025 for up to 9 MW / 20 MWh beside an existing wind turbine; developer not named.
Evidence and sources
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B057.