Vitreous LabsEnergy transparency

Hoby solar park battery

Being built, 10 MW · 12 MWh, in Lolland Municipality, owned by Better Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power10 MW
Capacity12 MWh
Duration1.2 hours
StatusBeing built, as of 21 March 2024
Owner’s dateend 2024, expected
Bidding zoneDK2, East Denmark
MunicipalityLolland
Grid connectionBeside the Hoby solar park on Lolland
Placed on the mapat Hoby, the place its source names (GeoNames)
Nearest transmission stationGloslunde (132 kV), 2 km away: 199 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerBetter Energy
DeveloperBetter Energy

Not published anywhere we have found: ultimate owner, built by, optimiser.

What the sources say

Better Energy's first battery, expected by the end of 2024. No later word from Better Energy that it runs was found.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B022.

All batteries  ·  On the map