Kalundborg solar and storage project (Alight)
Announced, 55 MW, in Kalundborg Municipality, owned by Alight. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 55 MW |
| Status | Announced, as of 21 April 2026 |
| Owner’s date | 2028, ready to build, expected |
| Bidding zone | DK2, East Denmark |
| Municipality | Kalundborg |
| Placed on the map | at the centre of Kalundborg Municipality (GeoNames) |
| Nearest transmission station | Onshøj (132 kV), 2 km away: · MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Owner | Alight |
Not published anywhere we have found: ultimate owner, developer, built by, optimiser.
What the sources say
Bought by Alight with 79 MWp of solar; ready to build expected in 2028 (trade press only). Capacity not stated.
Evidence and sources
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B063.