Kalundborg solar and storage project (Alight)

Announced, 55 MW, in Kalundborg Municipality, owned by Alight. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power55 MW
StatusAnnounced, as of 21 April 2026
Owner’s date2028, ready to build, expected
Bidding zoneDK2, East Denmark
MunicipalityKalundborg
Placed on the mapat the centre of Kalundborg Municipality (GeoNames)
Nearest transmission stationOnshøj (132 kV), 2 km away: · MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerAlight

Not published anywhere we have found: ultimate owner, developer, built by, optimiser.

What the sources say

Bought by Alight with 79 MWp of solar; ready to build expected in 2028 (trade press only). Capacity not stated.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B063.