Permitted, 4.6 MW, in Syddjurs Municipality, owned by NRGi Renewables. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 4.6 MW |
| Status | Permitted, as of 5 November 2025 |
| Owner’s date | summer 2026, expected |
| Bidding zone | DK1, West Denmark |
| Municipality | Syddjurs |
| Grid connection | Beside NRGi's solar park at Kolind, East Jutland's largest |
| Placed on the map | at Kolind, the place its source names (GeoNames) |
| Nearest transmission station | Mesballe (150 kV), 5 km away: 102 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Owner | NRGi Renewables |
| Ultimate owner | NRGi and Sampension |
| Built by | Capture Energy (battery system) |
Not published anywhere we have found: developer, optimiser.
What the sources say
Syddjurs Municipality approved it (release of 5 November 2025): 4.6 MW with about two hours' storage, "about 10 MWh", expected ready during summer 2026. No later word that it runs.
Evidence and sources
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B045.