Vitreous LabsEnergy transparency

Kvosted Energy Park battery

Operating, 50 MW · 200 MWh, in Viborg Municipality, owned by Solar Park Kvosted ApS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power50 MW
Capacity200 MWh
Duration4.0 hours
StatusOperating, as of 2 February 2026
Owner’s date29 December 2025, actual
Bidding zoneDK1, West Denmark
MunicipalityViborg
Grid connectionBehind the meter of the Kvosted solar park (about 100 MWp, operating since 2022), sharing its grid connection
Placed on the mapat Kvosted, the place its source names (GeoNames)
Nearest transmission stationLoldrup (150 kV), 11 km away: 181 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerSolar Park Kvosted ApS
Ultimate ownerEuropean Energy A/S
DeveloperEuropean Energy A/S
Built byEuropean Energy (own construction unit)
OptimiserDanske Commodities

What the sources say

Energised on 29 December 2025 and then in testing; inaugurated 2 February 2026. Built in seven months. The Nordic Investment Bank lent EUR 21.5m for it. Green Power Denmark (16 April 2026) says it delivers ancillary services to Energinet.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B001.