Operating, 8 MW · 9.2 MWh, in Kerteminde Municipality, owned by EWII. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power8 MW
Capacity9.2 MWh
Duration1.1 hours
StatusOperating, as of 13 May 2025
Owner’s date12 October 2023, first unit approved
Bidding zoneDK1, West Denmark
MunicipalityKerteminde
Grid connectionAt Lindø Offshore Renewables Center
Placed on the mapat Munkebo, the place its source names (GeoNames)
Nearest transmission stationOdense SØ (150 kV), 10 km away: 56 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerEWII

Not published anywhere we have found: ultimate owner, developer, built by, optimiser.

What the sources say

The first 2 MW / 2.2 MWh container was approved for Energinet's reserves on 12 October 2023, EWII's first in West Denmark. In March 2024 EWII said four more containers were being installed, taking the site to 8 MW / 9.2 MWh; in May 2025 it listed Munkebo among its operating batteries without a size.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B011.