Loldrup battery, Viborg
Being built, 60 MW · 200 MWh, in Viborg Municipality, developed by BattMan Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 60 MW |
| Capacity | 200 MWh |
| Duration | 3.3 hours |
| Status | Being built, as of 25 October 2026 |
| Bidding zone | DK1, West Denmark |
| Municipality | Viborg |
| Address in the permit | Aalborgvej 136, 8800 Viborg |
| Placed on the map | at the address its permit gives (Aalborgvej 136, 8800 Viborg), found on OpenStreetMap |
| Nearest transmission station | Loldrup (150 kV), 1 km away: 181 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Developer | BattMan Energy |
Not published anywhere we have found: owner, ultimate owner, built by, optimiser.
What the sources say
Viborg Municipality's rural-zone permit of 7 January 2025 allows up to 60 MW; a later permit covers additions and changes. BattMan lists it as under construction.
Evidence and sources
- name: battman.energy/projects
- municipality: viborg.dk/media/2pal0txi/aalborgvej-136-8800-viborg-landz…
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B027.