Lyngerup battery (BattMan)
Being built, 6 MW · 14 MWh, in Frederikssund Municipality, developed by BattMan Energy. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 6 MW |
| Capacity | 14 MWh |
| Duration | 2.3 hours |
| Status | Being built, as of 25 October 2026 |
| Bidding zone | DK2, East Denmark |
| Municipality | Frederikssund |
| Placed on the map | at Lyngerup, the place its source names (GeoNames) |
| Nearest transmission station | Lyngerup (132 kV), 1 km away: 191 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Developer | BattMan Energy |
Not published anywhere we have found: owner, ultimate owner, built by, optimiser.
What the sources say
Standalone, 6 MW / 14 MWh on BattMan's list (read 25 October 2026). Frederikssund's draft local plan 181 for a 250 MW battery park at Maglehøj south of Lyngerup (DK-B051) names no applicant; whether the two are linked is not stated.
Evidence and sources
- name: battman.energy/projects
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B033.