Nuvve Ringsted battery 2

Announced, 2 MW · 4 MWh, in Ringsted Municipality, owned by Nuvve Denmark ApS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power2 MW
Capacity4 MWh
Duration2.0 hours
StatusAnnounced, as of 11 November 2025
Owner’s dateend 2026, expected
Bidding zoneDK2, East Denmark
MunicipalityRingsted
Placed on the mapat Ringsted, the town its source names (GeoNames)
Nearest transmission stationRingsted (132 kV), 3 km away: 96 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerNuvve Denmark ApS

Not published anywhere we have found: ultimate owner, developer, built by, optimiser.

What the sources say

Ready to build in the first half of 2026, operation expected late 2026.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B066.

All batteries  ·  On the map