Vitreous LabsEnergy transparency

Toftlund battery

Operating, 20 MW · 45 MWh, in Tønder Municipality, owned by DK Transition Vault ApS. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power20 MW
Capacity45 MWh
Duration2.2 hours
StatusOperating, as of 25 October 2026
Bidding zoneDK1, West Denmark
MunicipalityTønder
Address in the permitDrejøvej 12, 6520 Toftlund
Placed on the mapat the address its permit gives (Drejøvej 12, 6520 Toftlund), found on OpenStreetMap
Nearest transmission stationMagstrup (150 kV), 20 km away: 184 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerDK Transition Vault ApS
DeveloperBattMan Energy
Built byBattMan Energy; Hitachi Energy (battery systems)

Not published anywhere we have found: ultimate owner, optimiser.

What the sources say

Tønder Municipality's screening decision of 24 April 2025 names DK Transition Vault ApS as the builder-owner, with BattMan applying for it, at 20 MW / 40 MWh on the site of a demolished power regulation plant. BattMan now lists 20 MW / 45 MWh, operating.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B016.

All batteries  ·  On the map