Torp solar park battery
Permitted, 25 MW, in Aabenraa Municipality, owned by SolEnergi Torp ApS (holder of the solar permit). Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.
The battery
| Power | 25 MW |
| Status | Permitted, as of 13 July 2026 |
| Bidding zone | DK1, West Denmark |
| Municipality | Aabenraa |
| Address in the permit | Tinglevvej 456, 6200 Aabenraa |
| Placed on the map | at the address its permit gives (Tinglevvej 456, 6200 Aabenraa), found on OpenStreetMap |
| Nearest transmission station | Ensted (150 kV), 6 km away: 399 MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026 |
Who is behind it
| Owner | SolEnergi Torp ApS (holder of the solar permit) |
Not published anywhere we have found: ultimate owner, developer, built by, optimiser.
What the sources say
Rural-zone permit 13 July 2026: about 25,000 kW for four hours. The capacity this implies, about 100 MWh, is not stated as such, so it is not entered.
Evidence and sources
From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B043.