Vandel III battery

Operating, 60 MW · 120 MWh, in Vejle Municipality, owned by Infranode and Bregentved Gods. Every fact below is as a published source states it, with the address beside it; a field not shown is one no source gave, and nothing is guessed.

The battery

Power60 MW
Capacity120 MWh
Duration2.0 hours
StatusOperating, as of 25 September 2026
Owner’s date25 September 2026, actual
Bidding zoneDK1, West Denmark
MunicipalityVejle
Grid connectionShares the grid connection of the 162 MWp Vandel III solar park, Erhvervspark Vandel
Placed on the mapat Vandel, the place its source names (GeoNames)
Nearest transmission stationMørup (150 kV), 4 km away: · MW for new production on the grid as it is, 0 MW for new consumption, in Energinet’s map of 1 February 2026

Who is behind it

OwnerInfranode and Bregentved Gods
Ultimate ownerInfranode
DeveloperInfranode

Not published anywhere we have found: built by, optimiser.

What the sources say

Six 10 MW units, expandable to 240 MWh. Investment decision January 2026; inaugurated 25 September 2026, the date used as its start. The split of ownership between Infranode and Bregentved Gods is not stated; supplier and optimiser are not named.

Evidence and sources

From owners’, developers’ and builders’ own releases and municipal and environmental permits, read by Vitreous; where a field rests on the trade press alone, the notes say so. Energinet publishes no meter, no price and no instruction per battery, so this page carries no money: what one megawatt is paid in Energinet’s markets is on the markets page, for the whole market and never for a named battery. The nearest transmission station is the nearest by distance on Energinet’s capacity map; where the battery actually connects is not published. List id DK-B006.