BAT Chío

A battery installation of 39.5 MW and 169 MWh in Guía de Isora, Santa Cruz de Tenerife, in public consultation. Every fact below is taken from the latest act in the regional gazette of the Canary Islands that states it, and every act is linked.

In the gazette

Battery power39.5 MW
Storage169 MWh
Hours at full power4.3
PromoterIberdrola Renovables Canarias, S.A.U.
ConfigurationStand-alone
MunicipalityGuía de Isora
ProvinceSanta Cruz de Tenerife
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
22 Oct 2026Public consultation; 39.5 MW, 169 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2026-211-3642

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of the Canary Islands, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.

All installations  ·  On the map