BESS Hibridación Parque Eólico Lomo del Moral

A battery installation of 1.8 MW and 4 MWh in San Bartolomé de Tirajana, Las Palmas, authorised to build. Every fact below is taken from the latest act in the regional gazette of the Canary Islands that states it, and every act is linked.

In the gazette

Battery power1.8 MW
Storage4 MWh
Hours at full power2.3
PromoterEólicos del Matorral, S.L.
ConfigurationAdded to a plant
Plant it is added toParque Eólico Lomo del Moral, wind
MunicipalitySan Bartolomé de Tirajana
ProvinceLas Palmas
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
25 Oct 2024Public consultation; 1.8 MW, 4 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2024-214-3514
30 Oct 2025Environmental decisionConsejería de Transición Ecológica y EnergíaBOC-A-2025-215-3705
17 Nov 2025Authorisation to build (autorización administrativa de construcción); 1.8 MW, 4 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2025-228-3877
10 Dec 2025First authorisation (autorización administrativa previa); 4 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2025-244-4211

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of the Canary Islands, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.

All installations  ·  On the map