Vitreous LabsEnergy transparency

BESS Icod 2

A battery installation of 5 MW and 10 MWh in Icod de los Vinos, Santa Cruz de Tenerife, in public consultation. Every fact below is taken from the latest act in the regional gazette of the Canary Islands that states it, and every act is linked.

In the gazette

Battery power5 MW
Storage10 MWh
Hours at full power2.0
PromoterEFM Solar 37, S.L.
ConfigurationStand-alone
MunicipalityIcod de los Vinos
ProvinceSanta Cruz de Tenerife
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
27 Oct 2025Public consultation; 5 MW, 10 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2025-212-3671

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of the Canary Islands, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.