Vitreous LabsEnergy transparency

BESS Móstoles 1_ST

A battery installation of 5 MW and 10 MWh in Alcorcón, Madrid, in public consultation. Every fact below is taken from the latest act in the regional gazette of Madrid that states it, and every act is linked.

In the gazette

Battery power5 MW
Storage10 MWh
Hours at full power2.0
PromoterEFM Solar 29, S. L.
ConfigurationStand-alone
MunicipalityAlcorcón
ProvinceMadrid
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
22 Oct 2026Public consultation; 5 MW, 10 MWhCONSEJERÍA DE MEDIO AMBIENTE, AGRICULTURA E INTERIORBOCM-20261022-35

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Madrid, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.

All installations  ·  On the map