Vitreous LabsEnergy transparency

BESS Prisca

A battery installation of 42 MW and 161 MWh in Jerez de la Frontera, Cádiz, in public consultation. Every fact below is the gazette’s own, from the latest act that states it, and every act is linked.

In the gazette

Battery power42 MW
Storage161 MWh
Hours at full power3.8
ConfigurationAdded to a plant
Plant it is added toparque solar fotovoltaico existente Prisca, 49.5 MW
MunicipalityJerez de la Frontera
ProvinceCádiz
SubstationArcos De La Frontera 400 kV
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
6 Nov 2026Public consultation; 42 MW, 161 MWh·BOE-B-2026-36324*

The acts marked with an asterisk have so far been read only by our parser, which can mistake a plant’s power for the battery’s; the full reading, with every figure checked against the act’s words, follows within a week. Where acts differ, the latest act that authorises the installation gives the figure above. Source: Boletín Oficial del Estado. Basado en datos de la Agencia Estatal Boletín Oficial del Estado.

All installations  ·  On the map