Vitreous LabsEnergy transparency

BESS San Lázaro

A battery installation of 15 MW and 72 MWh in Las Palmas de Gran Canaria, Las Palmas, in public consultation. Every fact below is taken from the latest act in the regional gazette of the Canary Islands that states it, and every act is linked.

In the gazette

Battery power15 MW
Storage72 MWh
Hours at full power4.8
PromoterEDP Renovables España, S.L.U.
ConfigurationStand-alone
MunicipalityLas Palmas de Gran Canaria
ProvinceLas Palmas
Step reachedIn public consultation

Every act, oldest first

PublishedWhat the act doesAuthorityAct
13 Nov 2025Public consultation; 15 MW, 72 MWhConsejería de Transición Ecológica y EnergíaBOC-A-2025-226-3843

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of the Canary Islands, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.

All installations  ·  On the map