Bess Troncal

A battery installation of 5 MW and 12.4 MWh in Vigo, Pontevedra, authorised to build. Every fact below is taken from the latest act in the regional gazette of Galicia that states it, and every act is linked.

In the gazette

Battery power5 MW
Storage12.4 MWh
Hours at full power2.5
PromoterNaturgy Renovables, S.L.U.
ConfigurationStand-alone
MunicipalityVigo
ProvincePontevedra
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
5 Apr 2023Public consultation; 5 MW, 12.4 MWhVicepresidencia Primeira e Consellería de Economía, Industria e InnovaciónDOG-V0653-230323-0005
14 Nov 2024Authorisation to build (autorización administrativa de construcción); 5 MW, 12.4 MWhConsellería de Economía e IndustriaDOG-G0763-311024-0022

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Galicia, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.