Ebro Energy O Rosal
A battery installation of 4.5 MW and 18 MWh in O Rosal, Pontevedra, authorised to build. Every fact below is taken from the latest act in the regional gazette of Galicia that states it, and every act is linked.
In the gazette
| Battery power | 4.5 MW net, 4.6 MW installed; the net figure from : “” |
| Storage | 18 MWh |
| Hours at full power | 4.0 |
| Promoter | O Rosal Almacenamiento, S.L.U. |
| Configuration | Stand-alone |
| Municipality | O Rosal |
| Province | Pontevedra |
| Step reached | Authorised to build |
Every act, oldest first
| Published | What the act does | Authority | Act |
|---|---|---|---|
| 27 Apr 2026 | Public consultation; 4.5 MW, 18 MWh | Consellería de Economía e Industria | DOG-G0763-200426-0021 |
| 6 Jul 2026 | Environmental decision; 4.5 MW | Consellería de Medio Ambiente e Cambio Climático | DOG-G0760-220626-0003 |
| 15 Oct 2026 | Authorisation to build (autorización administrativa de construcción); 4.5 MW, 18 MWh | Consellería de Economía e Industria | DOG-G0763-220926-0004 |
Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Galicia, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.