Vitreous LabsEnergy transparency

El Chorrillo Solar (BESS El Chorrillo Power)

A battery installation in Mairena del Alcor, Sevilla, authorised to build. Every fact below is taken from the latest act in the regional gazette of Andalucía that states it, and every act is linked.

In the gazette

Battery powernot stated in any act
Storage20 MWh
PromoterRP Energía Cuatro SL
ConfigurationAdded to a plant
Plant it is added toEl Chorrillo Solar, solar
MunicipalityMairena del Alcor, Carmona
ProvinceSevilla
SubstationBarras 15 kV subestación Cantosal
Step reachedAuthorised to build

Every act, oldest first

PublishedWhat the act doesAuthorityAct
16 Feb 2026Public consultationConsejería de Economía, Hacienda y Fondos Europeos - Consejería de Industria, Energía y MinasBOP-SE-2026-031028
19 May 2026Authorisation to build (autorización administrativa de construcción); 20 MWhConsejería de Economía, Hacienda, Fondos Europeos y Diálogo SocialBOJA-2026-94-32
21 May 2026Authorisation to build (autorización administrativa de construcción); 20 MWhConsejería de Economía, Hacienda y Fondos Europeos - Consejería de Industria, Energía y MinasBOP-SE-2026-096032

Each act was read in full and every figure checked against the act’s own words. Where acts differ, the latest act that authorises the installation gives the figure above. Source: the regional gazette of Andalucía, read 26 to 27 October 2026; only facts are taken from it, and each act is linked.